Uploaded image for project: 'AdMaxLocal'
  1. AdMaxLocal
  2. AML-2842

Migration uses incorrect budget to calculate bid

    Details

    • Type: Bug
    • Status: Closed
    • Priority: Major
    • Resolution: Fixed
    • Affects Version/s: Diu
    • Fix Version/s: Diu
    • Labels:
      None
    • Environment:

      Bidmgr: bidmgr-distribution-2.4.1.diu-SNAPSHOT-BUILD_35-t20140501120847-bin.tar.gz
      Core: smb-ear-2.4.1.diu-SNAPSHOT-p20-t20140430-190858-CI.ear
      Sapi: aml-sapi-2.4.1-20140430.140146-5.war

    • Sprint:
      Sprint 5, Sprint 6

      Description

      Created an order and deployed. Ran abu for the same day.
      Before migration the following is seen on Adwords,

      Budget for GT=Yen 6 and for GM=Yen 5 (Campaign tab)
      Default Max CPC for GT=6 GM=5 (AdGroups tab)
      Max CPC for GT=6 and GM=5 (Keywords tab)

      After migration,
      Budget remains the same on Adwords (Campaign tab)
      Default Max CPC for GT=3 GM=3 (AdGroups tab)
      Max CPC for GT=3 and GM=3 (Keywords tab)

      Expected Result:
      Default Max CPC and Max CPC should be same before and after migration

      The bid is being set to 3 because the current bid (either 5 or 6) is being compared against the wrong budget. The migration utility is using the budget from the gce_campaign table and it should be using the budget from st-tracker.admaxSearchEngineAccountActualDailyBudgets

        Attachments

          Activity

            People

            • Assignee:
              varshini.padmanabhan Varshini Padmanabhan (Inactive)
              Reporter:
              varshini.padmanabhan Varshini Padmanabhan (Inactive)
            • Votes:
              0 Vote for this issue
              Watchers:
              3 Start watching this issue

              Dates

              • Created:
                Updated:
                Resolved: